Industrial Engineer Engineering and Management Solutions at Work

September 2012    |    Volume: 44    |    Number: 9

The member magazine of the Institute of Industrial Engineers

My Account    |     Create Login

Management by Paul Engle

Industrial Engineer's monthly column about engineering management (September 2012) 

Take the gamble out of forecasting

You have been asked to optimize the size, location and inventory levels of a new warehouse. Your source of supply is offshore, with long lead-times and variable shipping times based on seasonality and other factors. Customer demand varies by season and is sensitive to the business cycle. Forecasting demand is problematic. Management sets on-time delivery goals at 100 percent of customer request, including same-day deliveries for large accounts. How large should the warehouse be, where should it be, and how much inventory should be kept to maximize service levels and inventory turns and minimize cost?


You must be an IIE member to have full access to this content.  Please log in at the top right corner of this Web page.

IIE members visiting this site for the first time must register.  As part of this process you will create a user name and password. This is a one-time process that requires your member number.

If you are not a member, join IIE now and begin enjoying benefits immediately, including full access to Industrial Engineer magazine.