Industrial Engineer Engineering and Management Solutions at Work

June 2012    |    Volume: 44    |    Number: 6

The member magazine of the Institute of Industrial Engineers

My Account    |     Create Login

The human link

Departmental thought worlds can distort supply chain reality one bit at a time 

By Tarikere T. Niranjan and Shashank Rao

Supply chain management traditionally has grappled with the technical side of the problem, whereas supply chains are socio-technical systems. ERP after clever ERP has failed because it does not recognize the humanistic part of the problem.


You must be an IIE member to have full access to this content.  Please log in at the top right corner of this Web page.

IIE members visiting this site for the first time must register.  As part of this process you will create a user name and password. This is a one-time process that requires your member number.

If you are not a member, join IIE now and begin enjoying benefits immediately, including full access to Industrial Engineer magazine.