Health Systems by D. Junell Scheeres
Industrial Engineer’s monthly column about health systems (July 2011)
Measuring performance
Occasionally, I come across a lean Six Sigma project that makes me yearn for the “good old days” of pulling out a stopwatch for a time study or developing the work breakdown schedule and sampling plan for a work sampling study.
You must be an IIE member to have full access to this content. Please log in at the top right corner of this Web page.
IIE members visiting this site for the first time must register. As part of this process you will create a user name and password. This is a one-time process that requires your member number.
If you are not a member, join IIE now and begin enjoying benefits immediately, including full access to Industrial Engineer magazine.