Industrial Engineer Engineering and Management Solutions at Work

June 2011    |    Volume: 43    |    Number: 6

The member magazine of the Institute of Industrial Engineers

My Account    |     Create Login

Management by Paul Engle

Industrial Engineer's monthly column about engineering management (May 2011) 

Crunch time

From 80 percent to 90 percent of information technology projects fail to achieve their stated objectives within the planned schedule and budget. How can we mitigate the risk?


You must be an IIE member to have full access to this content.  Please log in at the top right corner of this Web page.

IIE members visiting this site for the first time must register.  As part of this process you will create a user name and password. This is a one-time process that requires your member number.

If you are not a member, join IIE now and begin enjoying benefits immediately, including full access to Industrial Engineer magazine.